Client: St George, Central London |
Architects: Broadway Malyan, Mountford Piggott |
Contractors: St George Central London, Bilfinger Berger (UK) Limited, J. Reddington Limited |

On the North side of the Thames, the massive Imperial Wharf development, covering over ten acres provides 3500 new homes built in phases over the past seven years. Hubbard has been involved in the project from the outset, manufacturing and installing a wide range of metalwork to meet the growing needs of the Client.
A wide range of building styles have been used to create a village feel with shops, restaurants, apartments and a hotel around tree-lined boulevards.
Hubbard have supplied coated mild steel and stainless steel balustrades with glass infill and stainless steel handrail to the majority of the apartments, together with balustrades for terraces and roof gardens. The later blocks also required steel balconies with decorative steel balustrades.
With balustrades also supplied for internal and external stairs, Hubbard have supplied in excess of 7000 metres of balustrade for the project. Elsewhere in Imperial Wharf, Hubbard have manufactured gates, railings, street furniture, pergolas and grills to the communal roof gardens and courtyard areas.
A number of bespoke feature staircases were also supplied in the prestigious penthouse apartments.
Meeting the commercial and logistical challenges of supplying and fitting a wide range of metalwork in volume to an extended and busy site over many years is one of Hubbard’s major achievements.